Nate
NDK spent some time at my place working on the flat lap.
He mounted everything to a board and hooked up a motor.
A bonus was that I had a new belt that worked for the project.
It is running very smooth.
The board makes the unit portable. It is shown sitting on a Work Mate.
He also installed a new motor on the Lot O.
He took my combo unit home with him and will be refurbishing that. It does not need much.
Just a good cleaning and new paint. A check of the bearings. Install the end buffing attachment. Devise a water system to attach to the water tubing.
The combo ran pretty smooth. The saw and wheels are in good shape.
I could have never done these things myself, so the help is much appreciated.